Research on Civil Engineering
RESEARCH RECAPITULATION OF CIVIL ENGINEERING DEPARTMENT | ||||
No | Researcher | Tittle | Year | Program |
1 | Aditia Rojali | The Estimation of Runoff Debit on Java Island using the SCR Curve Number Method as the Basis for Flood Vulnerability Mapping
|
2016 -2017 | Civil Engineering |
2 | Agyanata Tua Munthe | The Analysis on Normal Concrete using the Fine Aggregate of Stone Ash | 2016 -2017 | Civil Engineering |
3 | Albert Eddy Husin, MTS | The Implementation of ISO 9001: 2008 Quality Management System Standards at PT UTOMO LADJU Contractors for the Caterpillar Factory Project | 2016 -2017 | Civil Engineering |
4 | Donald Essen | The Study on the Steel Frame Structure Calculation of the JS Luwansa Hotel Horse Project | 2016 -2017 | Civil Engineering |
5 | Edi Frizal Darma | The Stage Frame Analysis on Steel Structure Using Honey Comb Method | 2016 -2017 | Civil Engineering |
6 | Elhazri Hasdian | The Delay Analysis on the Construction of the Alpha Bonaventure-Atmajaya Hospital Jakarta Building | 2016 -2017 | Civil Engineering |
7 | Fadilla Turahmah | Risk Management on the Roof Repair Projects (Case Study: Roof Repair with 3 Tier Painting Method and Flashing Installation of Indonesia Epson Industry Factory 4) | 2016 -2017 | Civil Engineering |
8 | Gneis Setia Graha | Determining Significant Parameters in the Nreca Model | 2016 -2017 | Civil Engineering |
9 | Ika Sari Damayanthi Sebayang | The Study on the Potentials of the Cidurian River in the Gunung Halimun Salak National Park Region related to Renewable Energy Source | 2016 -2017 | Civil Engineering |
10 | Jantiara Eka Nandiasa | A Study on the Efficiency of Planting Water Requirements in the Watu Sumur Irrigation Network | 2016 -2017 | Civil Engineering |
11 | Mirnayani | An Analysis 0n Cost Escalation in Multi Years Projects (Case Study: Pesanggrahan Normalization Project, Package 1)) | 2016 -2017 | Civil Engineering |
12 | Muhammad Agus Primatama | The Strong Pressure Study on Screening With Additive Sika Type Viscocrete 3115 ID | 2016 -2017 | Civil Engineering |
13 | Muhammad Isradi | An Analysis on the Performance and the Service Level at Cengkareng Toll Gate (Prof. Dr. Ir. Sedyatmo) | 2016 -2017 | Civil Engineering |
14 | Retna Kristiana | The Effect of Operational and Maintenance Costs on Fast Train Investments in Indonesia | 2016 -2017 | Civil Engineering |
15 | Rezarial Ashadi | The Redesigning of the Upper Foundation Structure Using the Structure of Difa Soil Stabilizier (Case Study: Cilodong Street – JL. Ir. Juanda, Depok – Bogor) | 2016 -2017 | Civil Engineering |
16 | Satria Wibawa | An Analysis on Time Efficiency in the Use of Tatekata-Ace in the Concrete Filled Steel Tube (CFT) Erection Column (Case Study: Office Construction Project, South Jakarta) | 2016 -2017 | Civil Engineering |
17 | Yunita Dian Suwandari | The Maintenance of the Green Wall in Green Building (Case Study of Smart Parking Building Ministry of PUPR) | 2016 -2017 | Civil Engineering |
18 | Acep Hidayat | An Analysis on the Relationship of River Characteristics to Flood Potential Using HEC-RAS Software | 2016 -2017 | Civil Engineering |
19 | Agus Suroso | The Application of Occupational Safety and Health Management System (OSH) at the Project of Prima Signature Hotel Central Jakarta | 2016 -2017 | Civil Engineering |
20 | Alizar | An Evaluation on the Facility and Parking Capacity at Bekasi Station | 2016 -2017 | Civil Engineering |
21 | Desiana Vidayanti | A Study on Alpha Values of Carrying Power Drill Poles with Loading Test and Analysis Method | 2016 -2017 | Civil Engineering |
22 | Mawardi Amin | A Deviations Analysis on the Implementation of Construction Building Tenders | 2016 -2017 | Civil Engineering |
23 | Pintor Tua Simatupang, MTS | A Planning of Soil Retaining Walls with Diaphragm Wall at the AJB Bumi Putra Building Project in South Jakarta | 2016 -2017 | Civil Engineering |
24 | Resmi Bestari Muin, MTS | The Effect of Spans on the Schematic Plural Design Schemes, Effectively on the Symmetrical Regular Reinforced Concrete Structures | 2016 -2017 | Civil Engineering |
25 | Sylvia Indriany | An Analysis on the Road Performance of Ir. H. Juanda – Ciputat, South Tangerang | 2016 -2017 | Civil Engineering |
26 | Zaenal Arifin | The Vehicle Operating Costs based Tariff Determination Analysis (Case Study: Mayasari Bakti Patas Bus Route Pulogadung-Kampung Rambutan) | 2016 -2017 | Civil Engineering |
27 | Zainal Abidin Shahab | A Comparative Analysis on the Steel Construction of Bondeck Concrete Floors and Lightweight Concrete Floors | 2016 -2017 | Civil Engineering |
28 | Nunung Widyaningsih, MTS | An Evaluation on Passenger Train Services of Tanah Abang-Serpong Electric Rail (KRL) | 2016 -2017 | Civil Engineering |
29 | F. Sarwono Hardjomuljadi, MTS | A Comparative Study on Estimated Cost Budget Plans of 2-story Housing Work Type LB. 85 M2 / LT.90 M2 (Case Study: At Gading Residence Housing Development Project, Pamulang, Tangerang Selatan) | 2016 -2017 | Civil Engineering |
30 | Ali Sunandar | A Study on the Project Costs for the Building of 2-story Houses in Cinere, South Jakarta | 2016 -2017 | Civil Engineering |
31 | Anjas Handayani | An Analysis on Cost Changes in the Indonesian Supreme Court Building Project Due to Design Changes | 2016 -2017 | Civil Engineering |
32 | Apriyanto Saputra | An Analysis on Structural Job Implementation Methods to Accelerate South Quarter Project Implementation | 2016 -2017 | Civil Engineering |
33 | Det Komerdevi | A Waste Analysis of Iron Concrete in the High Rise Building Project (Case study: U-Residence 3 and Tower 5 Apartment Project) | 2016 -2017 | Civil Engineering |
34 | Diana Yusup | An Analysis on Parametric Coefficient Determining the Angular Irregular Structure Column Dimensions in the Seismic Design Category D | 2016 -2017 | Civil Engineering |
35 | Ernanda Dharmapribadi | An Analysis on the Planning of Sprinkler and Hydrant Fire Protection Systems at Graha Lestari Office Building | 2016 -2017 | Civil Engineering |
36 | Fadlin | A Study of the Travel Models for Private and Student Car Users at the University of Mercu Buana | 2016 -2017 | Civil Engineering |
37 | Fahmy Hermawan | An Analysis and the Planning on Fire Protection Systems in PT Raka Utama’s 5-storey Office Building | 2016 -2017 | Civil Engineering |
38 | Farid Fachrudin | An Analysis on the Delay Factor of Pancoran Riverside Apartment Construction Project Using the Fault Tree Analysis (FTA) Method | 2016 -2017 | Civil Engineering |
39 | Guntara Muria Adityawarman | A Mapping on soil carrying capacity and depth of hard soil layer supporting pillar foundation based on SPT data in the city of Jakarta | 2016 -2017 | Civil Engineering |
40 | Hamongan Girsang | An Analysis on Labor Productivity of Wood Wall Pair Work (Case Study of Dormitory For Manager Development Project, Coal Supervisor And Office in Barito Tuhup Raya, Murung Raya Regency, Central Kalimantan) | 2016 -2017 | Civil Engineering |
41 | Handoko | Flood Control in Campus Areas of Mercu Buana University Campus in Bekasi | 2016 -2017 | Civil Engineering |
42 | Hermanto Dwiatmoko | Identification of Signalized Intersection Queue Length using the 1997 MKJI Method (Case Study: Gaplek Road R.E. Martadinata, Tangerang Selatan) | 2016 -2017 | Civil Engineering |
43 | Irriene Iindah Susanti | The Cost Analysis of Red Brick Wall Work, Lightweight Brick, and Gypsum (Case Study: Boarding House Construction Project at Taman Permata, Lippo Village, Tangerang) | 2016 -2017 | Civil Engineering |
44 | Jef Franklyn Sinulingga | A Comparative Study between the Steel Structure Building Designs that Use Conventional Concrete Floor Plates and the Pre-Printed Lightweight Concrete Floor Plates (Case Study: Building Upside-down Formated Primaids) | 2016 -2017 | Civil Engineering |
45 | Krisma Perwita Sari | An Analysis on the Causes of Delay in Project Implementation in Pondok Indah Kapuk Mall and hotel for the next step of the Project Implementation Control Reference | 2016 -2017 | Civil Engineering |
46 | Kukuh Mahi Sudrajat | The Stability Study on the Slope in Suban Flare Area | 2016 -2017 | Civil Engineering |
47 | Madjumsyah Hariadi | An Analysis on the Delays in Building Construction Project Implementation (Viewpoint of Project Owners, Consultants and Contractors in Serang City) | 2016 -2017 | Civil Engineering |
48 | Muhammad Rudy Salahuddin | An Analysis on Project Cost Estimation using the Cost Significant Method in the High Rise Building Project | 2016 -2017 | Civil Engineering |
49 | Novika Candra Fertilia | A Quantity Surveyor Study in Pre Contract and Post Contract Phase, Case Study of Ad-Premier Office Project – Jakarta | 2016 -2017 | Civil Engineering |
50 | Prihadmadi Anggoro Seno | A Comparative Analysis of Zoning Planning and the Cycle of Bekisting Table Form System at the Prima Orchard Apartment Development Project | 2016 -2017 | Civil Engineering |
51 | Resi Aseanto | An Analysis on the Factors Affecting the Delays in Building Construction Projects in the BSD Serpong Region. Case Study on Andalan Headquarter Building Project and BSD Showroom – Serpong, Tangerang | 2016 -2017 | Civil Engineering |
52 | Ridwan Malawi | An Evaluation on the Implementation of a Health Management System, Work Safety to Achieve Zero Accident at The Pakubuwono Apartment Construction Project | 2016 -2017 | Civil Engineering |
53 | Sediyanto | A Comparative Analysis on the Use of Conventional Bekisting with Aluma System Bekisting as Concrete Molds in High Building Construction Projects Against Quality and Time (Case Study: Podomoro City Deli Medan) | 2016 -2017 | Civil Engineering |
54 | Suci Putri Elza | Redesignin the Shophouse Structure of Reinforced Concrete Due to Addition of Mini Tower and BTS Loads (Case Study: Bengkong Belimbing Village Site) | 2016 -2017 | Civil Engineering |
55 | Sumarmi | A Comparative Analysis on Installation Productivity of the Mpanel Walls and Conventional Walls (Bricks) (Case Study: Building Project for Ruko Modern Arcade in Tangerang). | 2016 -2017 | Civil Engineering |
56 | Suprapti | An Analysis on Inflation Value in the South Meruya Region | 2016 -2017 | Civil Engineering |
57 | Widodo Budi Dermawan | An Analysis on the Traffic Congestion Handling on Jalan Fatmawati Raya Section at Pondok Labu Non-Market Junction, South Jakarta | 2016 -2017 | Civil Engineering |
58 | Yusid Toyib | An Analysis on the Capacity, the Queue and the Service Level of Cengkareng Toll Gate (Prof. Dr. Ir. Sedyatmo) | 2016 -2017 | Civil Engineering |
59 | Zakky Wasthon Nusantara | Feasibility Study of the Dam in South Oku District, South Sulawesi Province | 2016 -2017 | Civil Engineering |
60 | Hendy Yusman Firdaus | An Analysis on Economic Feasibility for Funding from Bank Institutions In Construction On Progress Conditions In New Mansion Market Apartment Project | 2016 -2017 | Civil Engineering |
61 | Panani Kesai | The Geometric Design of Green Line Car Monorail (LRT) from Pejompongan – Kuningan – Pejompongan, Jakarta | 2016 -2017 | Civil Engineering |
62 | Fahmi | An Analysis on Quality Management Implementation ISO 9001: 2008 at Precast Concrete at Pt Waskita Beton Precast Plant Cibitung | 2016 -2017 | Civil Engineering |
63 | Budi Susetyo | A Complaint Analysis of the Loan Housing (KPR) Consumer on Housing Development Results of at Bank Permata Branch WTC II Sudirman Jakarta | 2016 -2017 | Civil Engineering |
64 | Patricia Kanicia Djawu | The Implementation of Occupational Safety and Health System (OSH) in the Geothermal Power Plant 1 Project X35MW Geothermal Energy Kamojang – Garut | 2016 -2017 | Civil Engineering |
65 | Aditia Kesuma Negara Dalimunthe | Geometric Planning Based on Light Transit Rail (LRT) From Bumi Serpong Damai (BSD) Towards Soekarno Hatta Airport | 2016 -2017 | Civil Engineering |
66 | Baskara Widy Aryanto Putro | A Comparative Analysis on Efficiency of Tubular and Angular Type Tower Material | 2016 -2017 | Civil Engineering |