International

No. Nama Dosen Judul Dihasilkan/ Dipublikasikan Pada Tahun Penyajian/ Publikasi
1 Mawardi Amin Development of Cost Estimation Model for Residential Building International kournal of Civil and structural Engineering Research ISSN 2348-7607 (Vol.5 ,issue 1,PP:1-4,Month April-September 2017) 2017
2 Mawardi Amin,Sofia W Alisjahbana,Manlian.R.A. Simanjuntak. The Pilot Analysis of The Fire Safety Protection System Model on High Rise Buildings in DKI Jakarta. Imperial Journal of Interdisciplinary  Research (Vol.-3,Issue-1,2017) ISSN :2454-1362 2017
3 Mawardi Amin,Adrian Ediningtyas The Effectiveness of Supply Chain Management in The Project Construction of the BULOG Modern Warehouse in Regional Division West Of Nusa Tenggara. Imperial Journal of Interdisciplinary  Research (Vol.-3,Issue-7,2017) ISSN :2454-1362 2017
4 Hidayat Prabandaru, Mawardi Amin A Review Of Procedures and Methods of Preparation of Claim Documents for The Optimize Insurance Coverage on Construction projects Imperial Journal of Interdisciplinary  Research (Vol.-3,Issue-8,2017) ISSN :2454-1363 2017
5 Acep Hidayat Flood Assessment Study in the City of Tangerang, West Java nternational Journal of Civil and Structural Engineering Research    ISSN 2348-7607 (Online) Vol. 5, Issue 1, pp: (31-35), Month: April – September 2017, Available at: www.researchpublish.com 2017
6 Putri, Selvina Tri Saptari and Amin, Mawardi Risk Analysis Works Precast Panel on Construction Project Apartment at Summarecon Serpong Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-8, 2017; ISSN: 2454-1362, http://www.onlinejournal.in 2017
7 Acep Hidayat Optimization Analysis of Irrigation Water Using Linear Program ISSN  2393-8471  International Journal of Recent Research in Civil and Mechanical Engineering (IJRRCME) Vol. 3, Issue 2, pp: (33-36), Month: October 2016 – March 2017, Available at: www.paperpublications.org 2017
8 Andayani, Dwi and Amin, Mawardi System Analysis Project Control Using Earned Value Method in Project Apartment at Summarecon Serpong Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-8, 2017; ISSN: 2454-1362, http://www.onlinejournal.in 2017
9 Mawardi Amin dan Yureana Feed Ratio Study Groundwater in Aquiter System Constrained up for Urban Areas International Journal of Recent in Civil and Mechanical Engineering (IJRRCME) . Vol 3,Issue 2,pp:(59-63),Month : October 2016 – March 2017 ISSN 2393-8471 (online) 2017
10 Yung Shin Mun, Joewono Prasetijo, Muhammad Isran Ramli, Muhammad Isradi. Analysis of Delay and Level of Service of Signalized Intersection at KM 18 and KM 20 Sustainable Transportation Infrastuctures Smart Driving Research Center (SDRC) ISBN 978-967-2110-70-5 2017
11 Randy, Virdilla and Amin, Mawardi Risk Analysis of Pile Foundation Erection Work on High Rise Building Construction Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-8, 2017; ISSN: 2454-1362, http://www.onlinejournal.in 2017
12 Julistya, Rizky and Amin, Mawardi A Calculation of Minimum Labor Cost Planning of the Concrete Casting Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-9, 2017; ISSN: 2454-1362, http://www.onlinejournal.in 2017
13 Idrus M.Alatas, Ramli Nazir, Masyhur Irsyam,Pintor T.Simatupang The Effect of Weathering Process to determination of Residual Shear strength of Clay Shale  with Triaxial Multi-atage System.  Proceedings of the 19th International Conference on Soil Mechanics and Geotechnical Engineering, Seoul 2017 2017
14 Muhammad Kholil, Bonitasari Nurul Alfa, Madjumsyah Hariadi Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency IOP Earth and Environmental Science 2017
15 Rachel Chrisanti and Mawardi Amin Work Productivity Analysis of Conventional Floor Structure and Hollow Core Floor Panel (HCFP) International Journal of Civil and Structural Engineering Research, Volume 5, Issue 1, pp: (98-105), Month April-September 2017; ISSN 2348-7607 2017
16 Ika Sari Damayanthi Sebayang Identification of Renewable Energy potential In Ciberang River,Cisarua,Village Bogor,West Java. IOP Conferences Series Material Science and Enginering Indexed by Scoupus 2017
17 Sarwono Hardjomuljadi “Variation Order, The Causal or The Resolver of Claim in The Construction Projects” International Journal of Applied Engineering Research ISSN 0973-4562 Volume 11 Number 14 (2016) pp 8128-8135, © Research India Publications, Scopus indexed, Q-3 2016
18 Acep Hidayat Analysis of Characteristics Soil to Drainage Capacity International Journal of Civil and Structural Engineering Research    ISSN 2348-7607 (Online) Vol. 4, Issue 2, pp: (52-56), Month: October 2016 – March 2017, Available at: www.researchpublish.com 2016
19 Resmi Bestari Muin dan Sylvia Indriany The Characteristic of Sand From The Eruption of Mount Kelud and Its Effect to Concrete Compressive Strength ARPN Journal of Engineering and Applied Sciences ISBN 1819-6608 VOL. 11, NO. 24, Dec. 2016, pp 14405 – 14414 2016
20 Krishna Mochtar, Manlian Ronald A.Simanjuntak dan Anjas Handayani Selecting the Installation Equipment of Precast Concrete Box Girder for Elevated Road Construction Project in Indonesia International Conference on Technology,Innovation,and Society (ICTIS) 2016
21 Aditia Kesuma Negara Dalimunthe Indonesian railway  performance case study : Yogyakarta – solo ,Indonesia Journal Of railway Engineering, Japan Society Civel Enginnering ,No 15 2016
22 Sarwono Hardjomuljadi “Commencement of Works vs commencement of Works Program (FIDIC Rainbow Conditions of Contracts)” Journal of Applied Environmental and Biological Sciences ISSN: 2090-4274, Volume 5 Number 8 (2015) pp.55-69, © 2015, TextRoad Publication. Copernicus indexed  Copernicus indexed 2015
23 Sarwono Hardjomuljadi “Latest Development in Civil Engineering” A Book to Honor the 80th Birthday of Prof. Dr. Ir. Wiratman Wangsadinata”, pp 131-158, ISBN 9786027204409, 447 p. : ill. ; 25 cm, 2015, WITness Press. 2015
24 Albert Eddy Husin, Moh. Ali Berawi, Suyono Dikun, Tommy Ilyas, Abdur Rohim, Boy Berawi Forecasting Demand On Mega Infarastructure Projects:Increasing Finansial Feasiliblity International Journal of Techno- logy ISSN 2086‐9614 2015) Vol. 6 no. 1: 73‐83 2015
25 Sarwono Hardjomuljadi “Analysis on the Possession of Site as Physical Cause of Claim and the Related Clauses in the FIDIC Conditions of Contract for Construction MDB Harmonised Edition”  Journal of Basic and Applied Scientific Research ISSN 2090-4304, Volume 4 Desember (2014) pp.109-121. © 2014 2014
26 Sarwono Hardjomuljadi “Factor Analysis on Causal of Construction Claims and Disputes in Indonesia (with reference to the construction of  hydroelectric power project in Indonesia)” International Journal of Applied Engineering Research ISSN 0973-4562 Volume10 Number 9, November 22 (2014) Scopus indexed. 2014
27 Moh. Ali Berawi, Bambang Sutantono, Perdana Miraj, Abdur Rohim Boy Berawi, Herawati Zetha Rahman, Gunawan, Albert Eddy Husin Enhancing Value for Money of Mega Infrastructure Projects Development Using Value Engineering Method Centeris 2014 2014/
Procedia Techno logy 16 pp 1037-1046 Elsevier
2014