Internasional
No. | Nama Dosen | Judul | Dihasilkan/ Dipublikasikan Pada | Tahun Penyajian/ Publikasi |
1 | Mawardi Amin | Development of Cost Estimation Model for Residential Building | International kournal of Civil and structural Engineering Research ISSN 2348-7607 (Vol.5 ,issue 1,PP:1-4,Month April-September 2017) | 2017 |
2 | Mawardi Amin,Sofia W Alisjahbana,Manlian.R.A. Simanjuntak. | The Pilot Analysis of The Fire Safety Protection System Model on High Rise Buildings in DKI Jakarta. | Imperial Journal of Interdisciplinary Research (Vol.-3,Issue-1,2017) ISSN :2454-1362 | 2017 |
3 | Mawardi Amin,Adrian Ediningtyas | The Effectiveness of Supply Chain Management in The Project Construction of the BULOG Modern Warehouse in Regional Division West Of Nusa Tenggara. | Imperial Journal of Interdisciplinary Research (Vol.-3,Issue-7,2017) ISSN :2454-1362 | 2017 |
4 | Hidayat Prabandaru, Mawardi Amin | A Review Of Procedures and Methods of Preparation of Claim Documents for The Optimize Insurance Coverage on Construction projects | Imperial Journal of Interdisciplinary Research (Vol.-3,Issue-8,2017) ISSN :2454-1363 | 2017 |
5 | Acep Hidayat | Flood Assessment Study in the City of Tangerang, West Java | nternational Journal of Civil and Structural Engineering Research ISSN 2348-7607 (Online) Vol. 5, Issue 1, pp: (31-35), Month: April – September 2017, Available at: www.researchpublish.com | 2017 |
6 | Putri, Selvina Tri Saptari and Amin, Mawardi | Risk Analysis Works Precast Panel on Construction Project Apartment at Summarecon Serpong | Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-8, 2017; ISSN: 2454-1362, http://www.onlinejournal.in | 2017 |
7 | Acep Hidayat | Optimization Analysis of Irrigation Water Using Linear Program | ISSN 2393-8471 International Journal of Recent Research in Civil and Mechanical Engineering (IJRRCME) Vol. 3, Issue 2, pp: (33-36), Month: October 2016 – March 2017, Available at: www.paperpublications.org | 2017 |
8 | Andayani, Dwi and Amin, Mawardi | System Analysis Project Control Using Earned Value Method in Project Apartment at Summarecon Serpong | Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-8, 2017; ISSN: 2454-1362, http://www.onlinejournal.in | 2017 |
9 | Mawardi Amin dan Yureana | Feed Ratio Study Groundwater in Aquiter System Constrained up for Urban Areas | International Journal of Recent in Civil and Mechanical Engineering (IJRRCME) . Vol 3,Issue 2,pp:(59-63),Month : October 2016 – March 2017 ISSN 2393-8471 (online) | 2017 |
10 | Yung Shin Mun, Joewono Prasetijo, Muhammad Isran Ramli, Muhammad Isradi. | Analysis of Delay and Level of Service of Signalized Intersection at KM 18 and KM 20 | Sustainable Transportation Infrastuctures Smart Driving Research Center (SDRC) ISBN 978-967-2110-70-5 | 2017 |
11 | Randy, Virdilla and Amin, Mawardi | Risk Analysis of Pile Foundation Erection Work on High Rise Building Construction | Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-8, 2017; ISSN: 2454-1362, http://www.onlinejournal.in | 2017 |
12 | Julistya, Rizky and Amin, Mawardi | A Calculation of Minimum Labor Cost Planning of the Concrete Casting | Imperial Journal of Interdisciplinary Research (IJIR); Vol-3, Issue-9, 2017; ISSN: 2454-1362, http://www.onlinejournal.in | 2017 |
13 | Idrus M.Alatas, Ramli Nazir, Masyhur Irsyam,Pintor T.Simatupang | The Effect of Weathering Process to determination of Residual Shear strength of Clay Shale with Triaxial Multi-atage System. | Proceedings of the 19th International Conference on Soil Mechanics and Geotechnical Engineering, Seoul 2017 | 2017 |
14 | Muhammad Kholil, Bonitasari Nurul Alfa, Madjumsyah Hariadi | Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency | IOP Earth and Environmental Science | 2017 |
15 | Rachel Chrisanti and Mawardi Amin | Work Productivity Analysis of Conventional Floor Structure and Hollow Core Floor Panel (HCFP) | International Journal of Civil and Structural Engineering Research, Volume 5, Issue 1, pp: (98-105), Month April-September 2017; ISSN 2348-7607 | 2017 |
16 | Ika Sari Damayanthi Sebayang | Identification of Renewable Energy potential In Ciberang River,Cisarua,Village Bogor,West Java. | IOP Conferences Series Material Science and Enginering Indexed by Scoupus | 2017 |
17 | Sarwono Hardjomuljadi | “Variation Order, The Causal or The Resolver of Claim in The Construction Projects” | International Journal of Applied Engineering Research ISSN 0973-4562 Volume 11 Number 14 (2016) pp 8128-8135, © Research India Publications, Scopus indexed, Q-3 | 2016 |
18 | Acep Hidayat | Analysis of Characteristics Soil to Drainage Capacity | International Journal of Civil and Structural Engineering Research ISSN 2348-7607 (Online) Vol. 4, Issue 2, pp: (52-56), Month: October 2016 – March 2017, Available at: www.researchpublish.com | 2016 |
19 | Resmi Bestari Muin dan Sylvia Indriany | The Characteristic of Sand From The Eruption of Mount Kelud and Its Effect to Concrete Compressive Strength | ARPN Journal of Engineering and Applied Sciences ISBN 1819-6608 VOL. 11, NO. 24, Dec. 2016, pp 14405 – 14414 | 2016 |
20 | Krishna Mochtar, Manlian Ronald A.Simanjuntak dan Anjas Handayani | Selecting the Installation Equipment of Precast Concrete Box Girder for Elevated Road Construction Project in Indonesia | International Conference on Technology,Innovation,and Society (ICTIS) | 2016 |
21 | Aditia Kesuma Negara Dalimunthe | Indonesian railway performance case study : Yogyakarta – solo ,Indonesia | Journal Of railway Engineering, Japan Society Civel Enginnering ,No 15 | 2016 |
22 | Sarwono Hardjomuljadi | “Commencement of Works vs commencement of Works Program (FIDIC Rainbow Conditions of Contracts)” | Journal of Applied Environmental and Biological Sciences ISSN: 2090-4274, Volume 5 Number 8 (2015) pp.55-69, © 2015, TextRoad Publication. Copernicus indexed Copernicus indexed | 2015 |
23 | Sarwono Hardjomuljadi | “Latest Development in Civil Engineering” | A Book to Honor the 80th Birthday of Prof. Dr. Ir. Wiratman Wangsadinata”, pp 131-158, ISBN 9786027204409, 447 p. : ill. ; 25 cm, 2015, WITness Press. | 2015 |
24 | Albert Eddy Husin, Moh. Ali Berawi, Suyono Dikun, Tommy Ilyas, Abdur Rohim, Boy Berawi | Forecasting Demand On Mega Infarastructure Projects:Increasing Finansial Feasiliblity | International Journal of Techno- logy ISSN 2086‐9614 2015) Vol. 6 no. 1: 73‐83 | 2015 |
25 | Sarwono Hardjomuljadi | “Analysis on the Possession of Site as Physical Cause of Claim and the Related Clauses in the FIDIC Conditions of Contract for Construction MDB Harmonised Edition” | Journal of Basic and Applied Scientific Research ISSN 2090-4304, Volume 4 Desember (2014) pp.109-121. © 2014 | 2014 |
26 | Sarwono Hardjomuljadi | “Factor Analysis on Causal of Construction Claims and Disputes in Indonesia (with reference to the construction of hydroelectric power project in Indonesia)” | International Journal of Applied Engineering Research ISSN 0973-4562 Volume10 Number 9, November 22 (2014) Scopus indexed. | 2014 |
27 | Moh. Ali Berawi, Bambang Sutantono, Perdana Miraj, Abdur Rohim Boy Berawi, Herawati Zetha Rahman, Gunawan, Albert Eddy Husin | Enhancing Value for Money of Mega Infrastructure Projects Development Using Value Engineering Method | Centeris 2014 2014/ Procedia Techno logy 16 pp 1037-1046 Elsevier |
2014 |